GPON/XGS-PON Test Procedure
The FX120/FX120 Lite is designed for use at the customer premises to aid with ONT/ONU activation and troubleshooting.
The FX120 is connected at the customer premises.
-
Power on the FX120/FX120 Lite test set. Testing should start automatically. Restarting measurements from the OPM menu (see OLT Information Table) resets items in the OPM Summary screen - the power level graphs and the Active ONU list in Advanced Mode. To clear the PLOAM list, go to the respective PLOAM menu and press the clear button.
-
Tap on Setup and configure the test profile settings according to the xPON class and ITU-T Test standards.
-
Inspect and clean the FX120/FX120 Lite test ports. Inspect and clean the fiber patch cord from the OLT and insert it into the FX120/FX120 Lite OLT test port.
-
If 1490/1577nm light is detected, the 1490/1577nm Status will display OK. Verify that the measured 1490/1577nm signal level is green (see OPM Test Mode).
-
All DS LEDs should turn from red to Green. If any LED remains red, clean and inspect the connectors again as specified in Step 4 (see GPON/EPON LED Status Indicators).
-
Inspect and clean the patch cord connectors that will connect FX120/FX120 Lite to ONU/ONT and the ONU/ONT test port.
-
Connect the FX120/FX120 Lite to the ONU/ONT test port. If 1310/1270nm light is detected, the Status will display OK. Verify that the measured 1310/1270nm signal level is green (see OPM Test Mode).
-
All US LEDs should turn from red to green. If any LED remains red, clean the ONU connections again as outlined in Step 6.
-
Confirm TC-Sync status displays OK DL. If you are not able to achieve TC-Sync, contact VeEX Inc. Support.
GPON OPM Setup menu
XGS-PON OPM Setup menu
Warning: Never look directly into the beam of an active optical source as this may result in harmful eye damage from radiation exposure.
GPON and XGS-PON Threshold Standards
For latest revisions of GPON standards, please visit https://www.itu.int/rec/T-REC-G.984.2-201908-I and for XGS-PON standards, please visit https://www.itu.int/rec/T-REC-G.9807.1/en.
Synchronizing the FX120/FX120 Lite with the ONU Activation Process
The FX120/FX120 Lite will synchronize to the downstream frame (from the OLT) provided the OLT is operational and 1490/1577nm signal level is good. The downstream frame synchronization indicator should occur almost immediately.
In order to synchronize with the ONU, the FX120/FX120 Lite needs to see the ONU registration process. Therefore, only connect the ONU AFTER the FX120/FX120 Lite application is already running. Otherwise, unplug and replug the ONU the ONU after the FX120/FX120 Lite application is running if the ONU is already connected to the FX120/FX120 Lite.
If the OLT and an active ONU are connected to the FX120/FX120 Lite before starting the test application, the FX120/FX120 Lite will not see the ONU activation and the above process will not be completed. In this instance, LOF will be reported for the upstream side; no ONU ID or ONU S/N information on the OPM results page will be displayed.